Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Generator Install Yreka Clinic 2/21/22 5pm
Install of a 300kW emergency generator to supply power for the Karuk Medical/Dental clinic locate... |
02/21/2022 | ||
|
115kv Air Switches for Currin Substation 2/10/22 2pm
The new Currin Substation design requires 25 sets of 115kv air switches. |
02/10/2022 | ||
|
City of Gold Beach 2021 WTP Improve 3/1/22 2pm
a. Demolition and removal of existing raw water intake building, controls, valve vault, |
02/01/2022 | 03/01/2022 | |
|
Quartz Neighborhood Park 2/23/22 2pm
The project includes 6.4 acres of new park development including a parking lot, pedestrian paving... |
02/01/2022 | 02/23/2022 | |
|
Walton MV Service & Switch Install 2/11/22 3pm
Purchase and installation of two (2) pad mount medium voltage dielectric switches, provide MV cab... |
01/27/2022 | 02/11/2022 | |
|
West Valley View Raod Improvements 2/17/22 2pm
Work associated with this project includes grinding existing asphalt and repaving West Valley Vie... |
02/17/2022 | ||
|
Ross Store #2402 S Medford 2/17/22 1pm
Tenant Improvement of a new 18,971 SF Ross Store. To include, but not limited to: demolition, ... |
02/17/2022 | ||
|
Districtwide Restroom Renovations 2/16/22 2pm
Restrooms to be individual rooms with full height walls, hollow metal frames with wood doors. Spe... |
02/16/2022 | ||
|
Fort Vannoy Parking Lot 2/11/22 2pm
The scope of this project is to renovate and expand the parking lot at Fort Vannoy Elementary Sch... |
01/27/2022 | 02/11/2022 | |
|
Howard Prarie Dock Construction & Install 3/9/22 10am
The work under this project includes construction and installation of docks and all attached appu... |
03/09/2022 | ||
| Title | Site Walk Through | Deadline |