| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Morrill Bridge Replacement 10/19/22 2pm Construct new gravel roadway along a new alignment. Install required guardrails. Construct new 100-f... | 10/05/2022 | 10/19/2022 | |
| Office Remodel ODOT District 11 10/4/22 11am Work includes constructing 2×4 walls, installing 2 new wood doors in hollow metal frames with h... | 09/20/2022 | 10/04/2022 | |
| Lilac Meadow Heat Pump Systems 9/30/22 2pm • Safely disable existing Electrical and Natural Gas for removal and reconnection of new equipment a... | 09/30/2022 | ||
| City Council Chambers AV Upgrade 10/25/22 3pm This project consists of the installation of an audiovisual systems, including equipment and materia... | 10/25/2022 | ||
| Wagner Creek Bridge Strengthening 10/20/22 2pm Complete bridge strengthening via near surface mounted carbon fiber polymer reinforcing located at t... | 10/20/2022 | ||
| U of O KCASI BP #2.2 – Excavation, Shoring & Tree Relocation 10/13/22 2pm Seeking sub bids for excavation, shoring & tree location. | 09/26/2022 | 10/13/2022 | |
| U of O KCASI Steel, Glazing, Concrete 10/13/22 2pm Seeking sub bids for Steel Modeling, Glazing and Concrete. | 09/26/2022 | 10/13/2022 | |
| Storm Damage Repair Elk Cr. Road 10/25/22 2pm The work to be done consists of traffic control systems, reinforcing and rebuilding the roadway, und... | 10/25/2022 | ||
| BBS Forrest Thinning Services 10/25/22 2pm • Create a forested landscape which supports the yield of a consistent source of high quality, cool ... | 10/06/2022 | 10/25/2022 | |
| JSFC Fitness Flooring Replacement 10/12/22 2pm Demolition & installation services for replacement fitness flooring. | 10/12/2022 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.