Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Bridge Approach Repairs 2/15/22 10am
Structure excavation, 1250 cubic yards; granular structure backfill – geotextile reinforced... |
02/15/2022 | ||
|
LCC Florence Doors Frames & Hardware 2/8/22 2pm
RFP is for door/frame/hardware supplies only. |
02/08/2022 | ||
|
Wood Poles 2/10/22 2pm
Wood poles for use in EWEB’s overhead electrical distribution system. |
02/10/2022 | ||
|
Design Build Ashland Public Works Ops 3/8/22 2pm
The City of Ashland is accepting proposals for DESIGN-BUILD Services for the development of Proje... |
02/15/2022 | 03/08/2022 | |
|
2022 Street Overlay 3/2/22 2pm
The Project includes approximately 16,078 square yards 1 ½” taper grind at curb/gutter and 20... |
03/02/2022 | ||
|
Slurry Seal 2022 Various Streets 2/15/22 2pm
Work to be done includes removing vegetation from cracks, sweeping street prior to slurry seal tr... |
02/15/2022 | ||
|
Salmon Harbor Marina RV Sanitary 2/22/22 2pm
Construction of two new RV sanitary dump stations. Installation of two underground storage tanks.... |
02/08/2022 | 02/22/2022 | |
|
Garrison’s Home & Sleep 2/15/22 12pm
New Commercial shell building and parking lot. |
02/15/2022 | ||
|
Genesis Apartments 2/8/22 12pm
Construction of three-story 62 Unit Apartment Complex |
02/08/2022 | ||
|
US101 OR38 Curb Ramps Project 2/17/22 9am
1. Install traffic control devices and pedestrian routing. |
02/17/2022 | ||
| Title | Site Walk Through | Deadline |