| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Sacred Heart Faith Formations 8/4/22 2pm
The proposed project is a new single-story 12,197 square foot religious-use building for Sacred H... |
07/08/2022 | 08/04/2022 | |
|
Enterprise Well #10 Motor Replace 7/28/22 3pm
Remove and replace submersible 150 HP, 4 pole well motor. |
07/28/2022 | ||
|
Washington Jefferson Park Soil Restore 8/9/22 2:30pm
Restoration of the irrigation system, topsoil, turf, and electrical to its original condition, pr... |
07/27/2022 | 08/09/2022 | |
|
Central Avenue Road Repairs 8/3/22 11am
Manhole Rehabilitation, ADA Curb Ramps, Erosion Control/Slope, Bank Stabilization, Sidewalks/Curb... |
07/20/2022 | 08/03/2022 | |
|
Cal Wastewater Pump Station 7/21/22 2pm
Perform design services for the rehabilitation of the existing California Lift Station located at... |
07/21/2022 | ||
|
Pacific Terrace Pipe Lining 7/28/22 2pm
Work shall include, but not necessarily be limited to: Lining of 2,350 feet of sewer main and top... |
07/19/2022 | 07/28/2022 | |
|
Oakland SCADA WWTP ***Cancelled***
The City of Oakland’s Wastewater Treatment Plant and lift station is responsible for treating, ... |
07/25/2022 | 08/18/2022 | |
|
CM/GC Riddle Fire Station Retrofit 7/29/22 4pm
The seismic retrofit of Riddle Fire Station includes the rehabilitation to the existing lateral | |||
|
Sweet Creek Rd. RFP 8/2/22 2pm
The work includes site investigation, design alternative analysis, preliminary design and constru... |
08/02/2022 | ||
|
Mercer Lake Road Paving 7/26/22 10am
Cold plane pavement removal 0 – 2 inches deep, 2,400 square yards; level 2, ½ inch, ACP Mi... |
07/26/2022 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.