Filter
Title | Site Walk Through | Deadline | |
---|---|---|---|
Remove & Replace Asphalt WWTP 10/19/20 12pm
Grind and remove existing asphalt, place new asphalt, and raise valve boxes and lids to grade at ... |
10/19/2020 | ||
Corvallis HS Supply Metal Building Systems 10/15/20 2pm
Supply of the Metal Building Systems |
10/15/2020 | ||
Solid Waste Welding Building Drainage 10/15/20 3pm
Replace asphalt concrete around the southwest corner of the Welding Building with concrete and as... |
10/15/2020 | ||
Annual Campus Roof Repair & Replace 10/27/20 2pm
Oregon State University (“OSU” and/or “Owner”) is conducting a competitive ONE OR TWOSTEP... |
10/12/2020 | 10/27/2020 | |
Asphalt Pavement Repairs 10/20/20 2pm
Asphalt Pavement Repairs on eight street sections with approximately 7,000 Square Yards of Asphal... |
10/20/2020 | ||
Cleveland & Emerald Watermain Replace 10/29/20 2pm
Construction of 8 inch potable waterline, construction of potable water services and fire hydrant... |
10/13/2020 | 10/29/2020 | |
Glenwood Substation Earthwork & Foundations 10/27/20 2pm
Prepare a plot of land for the construction of an electrical substation. The site prep work you a... |
10/13/2020 | 10/27/2020 | |
Goodpasture Bridge Roof Replacement 10/16/20 1pm
1. Work closely and collaboratively with Lane County engineering staff to develop plans that | 10/16/2020 | ||
Utility Water System Master Planning 10/26/20 3pm
Coos Bay-North Bend Water Board (Water Board) is requesting qualifications for Professional Eng... |
10/26/2020 | ||
Avion Water Office Building 10/14/20 2pm
New construction of a 6,702 square foot office building located at the NW corner of China Hat Roa... |
10/07/2020 | 10/14/2020 | |
Title | Site Walk Through | Deadline |