| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Alderpoint Rd. MP40 Storm Damage 7/27/21 2pm The work to be done consists of traffic control systems, reinforced roadways, reconstructed embankme... | 07/27/2021 | ||
| CM/GC Health Professions Building 7/16/21 2pm The selected CM/GC firm will provide construction management and general contracting services, start... | 07/07/2021 | 07/16/2021 | |
| HVAC Powell Butte Charter School 7/7/21 1pm Select a Design-Build contractor to develop projects that will improve the indoor air quality and HV... | 07/07/2021 | ||
| Head Start Facility Renovation 6/28/21 5pm Remove and dispose of all flooring, cabinets, and kitchen island. Install approximately 300 square f... | 06/28/2021 | ||
| Airport Road Improvements 7/8/21 5pm Road improvements along the north side of Airport Rd. Includes but not limited to; excavation, rock ... | 07/08/2021 | ||
| Ashland Library Renovation 7/27/21 2pm Project includes demolition, new carpet, ceiling tiles, new storage room walls and door, case work, ... | 07/09/2021 | 07/27/2021 | |
| North Bend HS Kitchen Upgrade 7/1/21 1pm Contract consists of the removal and replacement of the existing walk-in cooler/freezer and demo of ... | 07/01/2021 | ||
| Paving of Old 99 Hwy South 7/14/21 8:30am Implement temporary traffic control, perform cold-plane pavement removal, construct asphalt concrete... | 07/14/2021 | ||
| Chadwick Lane Crosswalk 7/14/21 8:30am Remove and reconstruct ADA ramps, sidewalks, curb and gutter. Install rectangular rapid flashing bea... | 07/14/2021 | ||
| Iverson Crossing Culvert 7/22/21 3:30pm Excavation and embankment Construct and maintain diversion during construction Construction of 17’ x... | 07/22/2021 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.