Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Renaissance Flats Apts. 2/24/22 2pm
72 Unit Apartment Complex and Clubhouse approximately 69,048 SF. Adroit Construction Compa... |
02/24/2022 | ||
|
SOU Conceptual Design Indigenous Garden 3/31/22 4pm
This RFQ seeks information that will supplement SOU’s exploration of a conceptual design for an... |
03/05/2022 | 03/31/2022 | |
|
Bridge Deck Overlay 3/1/22 10am
The approximate quantities are: 54 square yards Class 2 Preparation (Big Fall Creek Rd.), 480 squ... |
03/01/2022 | ||
|
2022 Roadway Repairs 2/22/22 2pm
This project consists of removal of existing ramps, curbs, and gutters, pavement removal, grindin... |
02/22/2022 | ||
|
Multisite Painting 2022 2/24/22 2pm
Preparing and painting the entire exterior of the school, along with application of water repella... |
02/10/2022 | 02/24/2022 | |
|
2022 Seal Coat Liquid Roads Ultra 3/11/22 1pm
The 2022 Seal Coat “Liquid Roads Ultra” Project will consist of approximately 342,000... |
03/11/2022 | ||
|
UO Baker Center Roof Replace Ph2 Area F 3/1/22 2pm
Removal of existing roof assemblies and installation of new roofing assemblies and flashing with ... |
02/08/2022 | 03/01/2022 | |
|
Runway 16-34 Seal Coat & Guidance Sign 3/3/22 2pm
The Project generally consists of minor crack repair, wide crack repair, pavement marking removal... |
02/14/2022 | 03/03/2022 | |
|
CM/GC Phoenix Reconstruction Project 3/1/22 2pm
The Southern Oregon Education Service District |
02/16/2022 | 03/01/2022 | |
|
Elevator & Lift Maintenance 2/18/22 1pm
The purpose of this RFQ is to retain professional elevator maintenance services for Oregon Techâ€... |
02/18/2022 | ||
| Title | Site Walk Through | Deadline |