Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Salmon Harbor Marina Dredging 6/30/22 2pm
Dredging approximately (up to) 20,000 cubic yards of river sediment from two locations in Winches... |
06/30/2022 | ||
|
Yreka Fuels Reduction Project 7/15/22 5pm
Hazardous fuels reduction activities required for the treatment of 50 acres and defensible space ... |
06/23/2022 | 07/15/2022 | |
|
Crescent Elk MS Emergency Generator 6/28/22 2pm
Provide & install emergency generator per specifications. |
06/15/2022 | 06/28/2022 | |
|
Deschutes Co. Fair & Expo HVAC & Controls 7/22/22 2pm
Implement Energy Trust energy saving protocols to modernize Deschutes County |
06/23/2022 | 07/22/2022 | |
|
Video Inspection Sewer Lines & Manholes 7/18/22 2pm
NASSCO PACP-Certified Closed-Circuit Television (CCTV) pipeline inspection of 133,215 ft. of grav... |
07/18/2022 | ||
|
BPA North Bend Roof & HVAC 7/22/22 4pm
Replace the roofing and Heating Ventilation and Air Conditioning (HVAC) system at the North Bend ... |
07/22/2022 | ||
|
US97 MP191-192 Paving Project 6/28/22 1pm
Construct a full width asphalt concrete pavement four inch inlay from MP 191.0 to 192.6 in both d... |
06/28/2022 | ||
|
West Greenhouse Construction Services 7/26/22 2pm
The scope consist of one new greenhouse that is 2,880 SF, one new greenhouse that is 7,776 SF, st... |
06/15/2022 | 07/26/2022 | |
|
Water Meter Hardware 6/23/22 2pm
Water Meter related equipment including double check valve assemblies, hoops, meter adapters, wat... |
06/23/2022 | ||
|
Water Tank Lining & Repairs 7/8/22 3pm
Replacement of several non-operational valves on the outlet lines of the park’s primary pot... |
06/22/2022 | 07/08/2022 | |
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.