Filter
Title | Site Walk Through | Deadline | |
---|---|---|---|
US26 Fairview & Idlewood ADA Ramps 3/29/22 2pm
Work includes removal of existing concrete sidewalk, sidewalk ramps, curbs, asphalt and construct... |
03/29/2022 | ||
Aquatic Weed Control 4/19/22 2:30pm
Control of aquatic invasive weeds on an as needed basis in a manner consistent with the City of E... |
03/30/2022 | 04/19/2022 | |
Fulton Shop Building Reroof 4/12/22 2pm
Removal of approximately 30,000 square feet of asphalt composition roofing and the installation o... |
03/23/2022 | 04/12/2022 | |
Sewer Interceptor Improvements 4/19/22 2pm
The Project consists of constructing ±6,350 feet of 24-inch sewer main, ±725 feet of 18-inch se... |
03/22/2022 | 04/19/2022 | |
Medford GA Apron Expansion 3/31/22 2pm
Project work consists of, but is not limited to, the following: grading, bituminous pavement cons... |
03/17/2022 | 03/31/2022 | |
Burney Water Meter Replacement 4/15/22 10am
The Project consists of installation of approximately 380 |
04/15/2022 | ||
Overlay Various Streets City of Medford 3/15/22 2pm
Work to be done consists of asphalt repairs, cold plane removal of pavement overlay of various st... |
03/15/2022 | ||
Bechelli Ln Loma Vista Traffic 4/14/22 3pm
This project includes the installation of a traffic signal at the intersection of Loma Vista Aven... |
04/14/2022 | ||
Flooring Supply & Install Services 3/30/22 2:30pm
The City of Eugene is seeking sealed Bids for Flooring supply and installations services. In gene... |
03/30/2022 | ||
Material Recovery Facilities Waste Mgmt 5/26/22 5pm
The County seeks proposals for the design, construction, and operation of a new material recovery... |
05/26/2022 | ||
Title | Site Walk Through | Deadline |