Filter
Title | Site Walk Through | Deadline | |
---|---|---|---|
Beulah Park Renovation 3/31/21 2pm
Construction of approximately 3420 sq. ft. of sidewalk, ADA parking stall, and approximately 300 ... |
03/31/2021 | ||
Coos Bay North Jetty Repair 3/23/21 10am
Includes toe, side slope, and crest repair construction above -18 feet NAVD88 elevation along 2,0... |
03/23/2021 | ||
Urban Area ADA Ramp Project 4/1/21 10am
Removing and replacing existing sidewalk ramps by reconstructing approximately 2740 linear feet o... |
04/01/2021 | ||
BLM Loon Lake Storm & Water Tank 3/26/21 12pm
Remove existing Restroom A and install Government furnished CXT vault rest rooms. Includes: tree ... |
03/16/2021 | 03/26/2021 | |
Deadfront Padmounted Switchgears 4/6/21 2pm
Deadfront Padmounted Switchgear 15 KV. |
03/23/2021 | ||
Padmounted Transformers 4/6/21 2pm
Single phase and three phase padmounted transformers for use in EWEB’s distribution system.... |
04/06/2021 | ||
Florence Center Seismic & Maint. 3/31/21 2pm
Building systems analysis, seismic stabilization, deferred maintenance renovations, along with th... |
03/31/2021 | ||
Chetco Comm. Library Renovations 4/6/21 2pm
Interior renovations to the main library area including the lobby in the Chetco Community Public ... |
03/23/2021 | 04/06/2021 | |
Hemlock St. Improve Oak to Alder 3/31/21 2pm
Construct approximately 390 lineal feet of new curb and gutter along the north side of Hemlock St... |
03/31/2021 | ||
42nd Street Overlay 3/25/21 2pm
Grind and overlay existing asphalt roadway, construct ADA ramps, sidewalks, driveways, signage, s... |
03/15/2021 | 03/25/2021 | |
Title | Site Walk Through | Deadline |