Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Glendale JR/SR High Seismic 12/8/22 5pm
Seismic Rehabilitation projects may include the following components: |
11/17/2022 | 12/08/2022 | |
|
Creekside Village Apts. Sprinkler & Fencing 11/30/22 5pm
Creekside Village Apartments is a phased project with 84 units in 14 buildings – 6 units pe... |
11/30/2022 | ||
|
Creekside Village Apts – Windows 11/23/22 5pm
Creekside Village Apartments is a phased project with a phased project with 84 units in 14 buildi... |
11/23/2022 | ||
|
District Wide Door Locks 11/28/22 2pm
Design and construction administration of district wide |
11/28/2022 | ||
|
Bend High School Modernization 12/5/22 2pm
• Demolition of portions of the existing campus & buildings |
12/05/2022 | ||
|
Fire Station 1201 Seismic 12/15/22 4pm
Seismic strengthening for the Crook County Fire & Rescue Fire Station 1201. The building cons... |
11/28/2022 | 12/15/2022 | |
|
OR58 Fix It Corridor Culverts 12/1/22 2pm
Highway street and bridge construction. |
12/01/2022 | ||
|
US101 MP214-218 Tree & Vegetation Clearing 11/29/22 2pm
Contract to fall trees, trim tree canopy, remove brush and vegetation, chip material and treat ha... |
11/29/2022 | ||
|
Willamette High School CTE 12/20/22 2pm
Eugene, Or. Pre-Bid: Mandatory 11/15 3:30pm at Willamette High School, 1801 Echo Ho... |
11/15/2022 | 12/20/2022 | |
|
CM Lake Blvd Transmission Water Main 12/13/22 3pm
Installation of approximately 9,400 feet of 24-inch ductile iron water main in Lake Boulevard fro... |
12/13/2022 | ||
| Title | Site Walk Through | Deadline |