Filter
Title | Site Walk Through | Deadline | |
---|---|---|---|
Electric Vehicle Charging Sundial Bridge 6/22/21 3pm
This project will install level III electric vehicle (EV) chargers in the Sundial Bridge parking ... |
06/22/2021 | ||
Table Rock Rd. Mosquito to Antelope 6/10/21 10am
Grading, storm drainage, paving, permanent durable pavement markings, and other miscellaneous ite... |
06/10/2021 | ||
John F Moehl Stadium Renovation 7/28/21 1pm
The primary goal of this project is to upgrade the exterior and interior quality of the fieldhous... |
06/04/2021 | 07/28/2021 | |
Student Health Center Building Add 6/15/21 1pm
The project consists of an 1800 SF single story addition to the existing student health center wh... |
05/25/2021 | 06/15/2021 | |
Berkeley Park Renovation 6/3/21 2pm
The scope of work for this contract includes: |
06/03/2021 | ||
WTP Emergency Backup Generator 7/20/21 5pm
Purchase & install an emergency backup 30kw propane generator system to operate the water tre... |
07/20/2021 | ||
Irvington Pump Station Transfer Switch 6/15/21 2:30pm
Removal of existing switch gear and installation of new 480-volt, 3 phase, 1000 ampere switch gea... |
05/27/2021 | 06/15/2021 | |
D7 SB Canyon Mountain MIM Paving 5/26/21 3pm
Complete Cold Plane Pavement Removal of asphalt concrete surface, furnish and place Emulsified As... |
05/26/2021 | ||
Stewart Parkway Pavement Rehab 6/2/21 2pm
Pavement rehabilitation, including grinding, paving, and striping. |
06/02/2021 | ||
Ridge Rd. Watermain Extension 6/3/21 3pm
EXTENDING APPROXIMATELY 164 LINEAL FEET OF 8″ |
05/27/2021 | 06/03/2021 | |
Title | Site Walk Through | Deadline |