Filter
Title | Site Walk Through | Deadline | |
---|---|---|---|
Upper West Branch Bridge 4/26/22 1pm
The purpose of this project is to fully replace the Upper West Branch Creek Bridge on Forest Rout... |
04/26/2022 | ||
Territorial Hwy Improve Kruger to Fir 4/28/22 3pm
Designing and preparing construction drawings and specifications |
04/28/2022 | ||
Silva Theatre Sound System 5/3/22 2:30pm
Provision of a sound system for the Silva Theater at the Hult Center for the Performing Arts. The... |
05/03/2022 | ||
Klamath Falls Sonic Project 4/14/22 4pm
Trades involved include but are not limited to; Site/Civil, Landscaping, Underground Utilities, S... |
04/14/2022 | ||
East Science MV Electrical Loop 4/12/22 3pm
Purchase and installation of three (3) pad mount medium voltage dielectric switches, provide MV c... |
03/29/2022 | 04/12/2022 | |
OR542 Curb Ramps Project 4/14/22 9am
1. Install temporary traffic control devices and pedestrian routing. |
04/14/2022 | ||
Margaret Keating ES Reroof 4/27/22 1pm
Removal of existing built-up asphalt roofing, gutters & downspouts. |
04/13/2022 | 04/27/2022 | |
Holly Theatre 4/29/22 2pm
Renovations & Restoration of Historic Theatre. Trades include but not limited to: demolition,... |
04/29/2022 | ||
Harrison Ave. Pavement Maintenance 4/12/22 2pm
Work to be performed includes, but not limited to, grinding and paving, construction and replacem... |
04/12/2022 | ||
SOU Beach Volleyball Courts 4/21/22 3pm
The work scope includes, but is not limited to: |
04/11/2022 | 04/21/2022 | |
Title | Site Walk Through | Deadline |