Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Grants Pass Water Treatment 9/19/24 2pm
Grants Pass, Or. General Contractor |
09/19/2024 | ||
|
Fire Station #3 Renovation 9/10/24 2pm
Eureka, Ca. Contact: Riley Topolewski |
09/10/2024 | ||
|
Semi Down Draft Paint Booth 8/30/24 1pm
Klamath Falls, Or. Pre-Bid: Non-Mandatory 8/16 11am at Kingsley Field Ai... |
08/16/2024 | 08/30/2024 | |
|
Shasta Dam Hanger Rod Installation 9/6/24 5pm
Shasta Co. Ca. Pre-Bid: Non-Mandatory 8/20 10am at Shasta Dam 16349 Shast... |
08/20/2024 | 09/06/2024 | |
|
Hazard Tree Mitigation Crater Lake NP 8/27/24 2pm
Crater Lake, Or. Contact: Brenda Lewis |
08/22/2024 | 08/27/2024 | |
|
Gold Beach Ranger District Electrical Panel Replace 8/19/24 4pm
Gold Beach, Or. Contact: Susie Felton |
08/19/2024 | ||
|
Garfield Water Tank Rehab Crater Lake NP 9/6/24 3pm
Crater Lake, Or. Pre-Bid: Non-Mandatory 8/22 9am 1 Sager Building Crater ... |
08/22/2024 | 09/06/2024 | |
|
New HQ Water Source NPS Oregon Caves 9/6/24 3pm
Josephine Co. Or. Pre-Bid: Non-Mandatory 8/23 1pm at Oregon Caves Nation... |
08/23/2024 | 09/06/2024 | |
|
Highway 26 Sewer & Water Extension 9/3/24 2pm
Prineville, Or. Pre-Bid: Non-Mandatory 8/20 2pm 387 NE Third Street, Pri... |
08/20/2024 | 09/03/2024 | |
|
HVAC Maintenance Repair Replace OED 8/27/24 9am
Eugene, Or. Pre-Bid: Mandatory 8/14 11am at OED’s WorkSource Field... |
08/14/2024 | 08/27/2024 | |
| Title | Site Walk Through | Deadline |