| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| EHRM Roseburg Training Site Prep 9/11/20 2pm Involves electrical and telecommunications work for the EHRM Training Site located at the VAMC in Ro... | 08/28/2020 | 09/11/2020 | |
| Water Replacement Project Schedule A & B 9/29/20 2pm Schedule A Project consists of installing approximately 2,050 LF of 10-inch water main, 4,975 LF of ... | 09/04/2020 | 09/29/2020 | |
| Cypress Avenue Restore & Enhance 9/22/20 3pm This project includes the installation of 2 bridges on the floodplain of the Sacramento River, south... | 09/10/2020 | 09/22/2020 | |
| Fishing Pier Construction 9/16/20 2pm Construction of a concrete, steel, and FRP fishing pier on breakwater of the Coquille River, near th... | 09/04/2020 | 09/16/2020 | |
| Mohawk and Olympic Overlay 9/24/20 2pm Mill and pave Mohawk Blvd. from G St. to approximately 100 feet south of the Mohawk Blvd. and 18th S... | 09/17/2020 | 09/24/2020 | |
| VAMC Pharmacy Reconstruction 9/15/20 2pm Perform major reconstruction of a pharmacy area at the VAMC located in Roseburg OR. | 09/15/2020 | ||
| Water Improvements 2020 9/29/20 2pm Installation of water main (6″ & 8″) and associated water appurtenances, new water s... | 09/10/2020 | 09/29/2020 | |
| ADA Curb Ramp Project 9/29/20 3pm Construct 18 curb ramps, replace 4 fire hydrants, and replace two storm water drain pipes with 4 cat... | 09/29/2020 | ||
| Loleta Community Services Compliance Project 9/29/20 3pm The Work consists of, but is not limited to, furnishing all labor, materials, equipment, and inciden... | 09/10/2020 | 09/29/2020 | |
| 2020 D7 North Douglas Fencing 9/10/20 3pm Furnish equipment, labor and materials necessary to remove existing fencing and to construct new fen... | 09/10/2020 | ||
| Title | Site Walk Through | Deadline |