| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| OR126W Crack Sealing MP 32-47 8/20/20 11am | 08/20/2020 | ||
| Gardner Ridge Road Slide Repair 8/25/20 2pm Design, build, and warranty a permanent micropile grade beam and soil nail retaining wall system to ... | 08/18/2020 | ||
| Cooling Water Geothermal Red Rock Biofuels 9/10/20 2pm Consists of 12,680 lineal feet of trench excavation, 284 lineal feet of bores, two complete pump sta... | 08/27/2020 | ||
| Brownfield Grant & Implementation Assist 8/28/20 5pm | 08/28/2020 | ||
| Audio Visual Equipment & Setup 9/21/20 2pm Provide Audio/Video Equipment and Setup for four conference rooms at the Klamath County Government C... | 09/15/2020 | ||
| Douglas High School Package 5 9/15/20 4pm For all remaining work scopes at Douglas High School. Remaining work to bid includes polished concre... | 09/15/2020 | ||
| Northeast Crossing Trail Phase One 9/3/20 Prepare and pave 2,740 linear feet of 10-foot-wide pedestrian trail crossing Boulder Creek. Asphalt ... | 09/03/2020 | ||
| Annual Fire Sprinkler Inspection 8/31/20 3pm Conduct annual I/A/W NFPA 25 inspection on all water based fire protection systems on the Southern ... | 08/25/2020 | ||
| Front St. Hemlock to Greenwood 8/18/20 2pm | - | ||
| ITB Sewage Treatment Sys Upgrade 8/18/20 2pm Establish a Contract for the new sewage treatment system to serve Lincoln Savage Middle School, loca... | 08/18/2020 | ||
| Title | Site Walk Through | Deadline |