| HHSA Ramp Improvement 9/30/20 1pm Construction of new accessible ramp system for the Health and Human Services Building including all ... | 09/16/2020 | 09/30/2020 | |
| Brockway Rd Water Main Replacement 9/15/20 2pm Connect to existing water line and install approximately 695 lineal feet of 10-inch water line and 1... | 09/15/2020 | ||
| Estates Lane Road Improvement 9/17/20 3pm THE PROJECT WILL CONSIST OF THE INSTALLATION OF APPROXIMATELY 1,975 SF OF CONCRETE SIDEWALK, 295 SF ... | 09/17/2020 | ||
| CM/GC Ashland High School 9/30/20 2pm Ashland High School Modernization Project includes renovations, additions, structural improvements, ... | 09/30/2020 | ||
| Vogel Shop & RV 9/15/20 4pm 24×38 shop with 12×28 RV covered area. Includes footings, slab, 2×6 construction trus... | 09/15/2020 | ||
| Army Building Demolition 9/22/20 1pm The Project consists of demolition of the existing Armory Building in preparation for a future const... | 09/09/2020 | 09/22/2020 | |
| Pilot Butte Canal Concrete, Bridge 9/17/20 2:30 pm The purpose of this section is to define the responsibilities for Cast-in-Place (CIP) Concrete. All ... | 09/03/2020 | 09/17/2020 | |
| Salt Creek Heights Neighborhood Park 9/22/20 3pm This project includes the construction of park facilities; including storm drain, sanitary sewer sys... | 09/22/2020 | ||
| Lane County Naval Storage Building 9/22/20 3pm Construction of a new pre-engineered metal storage facility approximately 4000 sq/ft, located at the... | 09/10/2020 | 09/22/2020 | |
| Chetco River Replace Fuel Tank 10/13/20 2pm Remove and replace fuel tank and associated components at Station Chetco River in Brookings | 09/09/2020 | 10/13/2020 | |