| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Newmark Bank Stabilization 10/6/20 2pm Excavate west end of Newmark Ave., install riprap, and install 60 feet of cured-in-place pipe lining... | 09/24/2020 | 10/06/2020 | |
| Humboldt Co. Jail ADA Improvements 10/6/20 2pm Work will consist of improvements to the second, third, and fifth floors to achieve compliance with ... | 09/29/2020 | 10/06/2020 | |
| Cooling Tower Repairs 10/21/20 3pm Address and repair parts of the cooling tower. Replace the existing fire protection system with a ne... | 09/29/2020 | 10/21/2020 | |
| Install Sliding Glass Doors City Hall 10/7/20 2pm The Contractor shall, at his own expense, furnish all labor, materials, tools, transportation, equip... | 09/23/2020 | 10/07/2020 | |
| Cher-Ae-Heights Casino Hotel 10/9/20 5pm A new 77,100 square foot 100 room Hyatt Place Hotel | 10/09/2020 | ||
| Merlin Landfill Water Quality Swale 10/1/20 3pm Project includes: traffic control, erosion & sediment control, construction staking, demolition,... | 09/24/2020 | 10/01/2020 | |
| RHMA-G HMA & Concrete Barrier 10/22/20 2pm In Humboldt County In And Near Eureka From 0.8 Mile South Of Tompkins Hill Road Overhead To 0.4 Mile... | 10/22/2020 | ||
| Klamath Boat Marina to Lakeshore 10/8/20 2pm This project is to widen a six mile stretch of roadway along OR 140 to accommodate current and futur... | 10/08/2020 | ||
| Street Striping Project 9/29/20 2pm Repainting approximately: Approx. 171,500 total lf of yellow center line (Includes 4″ single y... | 09/29/2020 | ||
| Flooring at City Hall Common Areas 10/1/20 3pm Contractor shall furnish equipment, material, and labor for the installation of commercial grade Man... | 10/01/2020 | ||
| Title | Site Walk Through | Deadline |