| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Conduit Install S. 69th Place 10/22/20 2pm Install underground facilities consisting of one (1) (4×4) concrete vaults, multiple two-inch (... | 10/08/2020 | 10/22/2020 | |
| Prineville Rails to Trails Project 10/8/20 9am Work includes grading, paving, curb ramps, signing and signal. | 10/08/2020 | ||
| CM/GC Community Hall Slope 10/8/20 2pm OSU is seeking proposals from qualified CM/GC firms to provide pre-construction services, constructa... | 09/24/2020 | 10/08/2020 | |
| Architectural Design Boivin Hall 10/13/20 1pm The Oregon Institute of Technology (“Oregon Tech”) is seeking proposals to select a contractor to pr... | 10/13/2020 | ||
| Phoenix High School BP3 Project 10/15/20 2pm Final Cleaning, Selective Demolition, Strengthening of Cast-In-Place Concrete, Concrete Floor Polish... | 09/25/2020 | 10/15/2020 | |
| Umpqua Dunes Staging Area Expansion 10/7/20 2pm Slurry seal existing trailhead, pave existing gravel parking, and expand trailhead to a paved standa... | 09/25/2020 | 10/07/2020 | |
| OR42 Cedar Point Rd Finley Lp 10/15/20 9am Project includes roadway construction, paving, curb ramps, erosion control, drainage, traffic contro... | - | ||
| OR126 Florence Eugene Shoulder Widen 10/8/20 9am Project includes roadway construction, traffic control, erosion control, signs, and pavement marking... | 10/08/2020 | ||
| OR234 Gold Hill Sams Valley Intersection Project 10/8/20 9am Project includes roadway construction, traffic control, erosion control, signs, signals, illuminatio... | 10/08/2020 | ||
| Northbound Port of Entry Paving Project 10/7/20 2pm The purpose of this ITB is to establish a Contract for furnishing materials, equipment, labor, and p... | 10/07/2020 | ||
| Title | Site Walk Through | Deadline |