| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Tree & Veg Clearing OR238 MP32-33 2/11/21 3pm Furnish material, equipment, and labor to fall trees, trim tree canopy, remove vegetation, chip mate... | 02/11/2021 | ||
| Stormwater Facility & Taxiway Removal 3/2/21 2pm Demolition of the existing Taxiway B3 and the constructionof two separate stormwater facilities: an ... | 02/11/2021 | 03/02/2021 | |
| Engineering & Environmental Pump House 1 2/26/21 3pm Provide environmental consulting and professional design services for the Pump House #1 Generator Pr... | 02/26/2021 | ||
| 20/30 Park Renovation 3/5/21 5pm The Project scope and needs include the design of multi-use athletic courts including volleyball, pi... | 02/16/2021 | 03/05/2021 | |
| Chinese Immersion Program Renovation 2/18/21 2pm Renovation of classrooms in the existing Buildings C, E, F, and G at Kennedy Middle School to accomm... | 02/09/2021 | 02/18/2021 | |
| Seabreeze & Lake Ct. Storm Drain Replace 2/25/21 2pm The Project entails two Schedules for removal and replacement of storm drain line, rehabilitation of... | 02/16/2021 | 02/25/2021 | |
| Sunset HS Fire Alarm Replace 3/31/21 1pm Remove existing fire alarm system and replace with new automatic, voice annunciated fire alarm syste... | 03/17/2021 | 03/31/2021 | |
| Margaret Keating Elem Fire Alarm Replace 3/8/21 1pm Remove existing fire alarm system and replace with new automatic, voice annunciated fire alarm syste... | 02/18/2021 | 03/08/2021 | |
| Comm Svcs. Shop, Parking Lot & Site Utilities 2/25/21 2pm The work consists of a new 1,536 sq. ft. building with associated utilities, parking lot, driveway/s... | 02/04/2021 | 02/25/2021 | |
| Homes for Good 1100 Charnelton 2/26/21 2pm The 1100 Charnelton project will construct a (4) story permanent supportive housing structure at 110... | 02/26/2021 | ||
| Title | Site Walk Through | Deadline |