| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Cook St. Sewer Replacement 1/28/21 2pm Work shall include, but not necessarily be limited to: Construction of 8 inch sewer main, manholes, ... | 01/19/2021 | 01/28/2021 | |
| Maple Avenue Staircase 2/10/21 2pm Construction of a staircase leading into the Dry Canyon. The Project includes a stairway that traver... | 02/10/2021 | ||
| RFQ Port of Coos Bay Rail Line 2/4/21 3pm The Port intends to award three different Contracts for On Call Railway Bridge Repair work as work i... | 02/04/2021 | ||
| US101 Culvert & Fish Passage Upgrades 1/28/20 9am Earthwork and Drainage. | 01/28/2021 | ||
| Fred Meyer Brookings 1/28/21 10am Including, but not limited to: restripe parking lot, demolition, concrete patching (refer to plumbin... | 01/28/2021 | ||
| Del Norte USD HVAC 1/28/21 2pm DEMOLITION AND REPLACEMENT OF (E) HVAC UNITS AT THE FOLLOWING SCHOOL SITES : 1. BESS MAXWELL ELEMENT... | 01/15/2021 | 01/28/2021 | |
| Beaver Hill Pit Roof Structure 2/18/21 2pm Work on this Project shall consist of the construction of an approximately 20,730 square foot pre-en... | 01/25/2021 | 02/18/2021 | |
| SW Sewer Basin Phases 1 & 2 Extension 2/9/21 2pm The Scope of Work includes, but is not limited to, trenching and installation of gravity sewer pipel... | 02/09/2021 | ||
| Bulk Water Station Addition 1/26/21 10am The work under this project includes all materials, labor, and equipment necessary for grading, unde... | 01/26/2021 | ||
| RFQ Airport Environmental Assessment 1-28-21 1pm The Josephine County Airports is seeking proposals from qualified firms to provide environmental eva... | 01/28/2021 | ||
| Title | Site Walk Through | Deadline |