| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| CM/GC Knight Campus 4th Floor Surgery Suite 3/3/21 2pm This project will renovate a portion of the fourth floor in the west tower of Knight Campus, with th... | 02/19/2021 | 03/03/2021 | |
| Benton County Tenant Improvement 3/19/21 2pm All aspects of construction to include but not be limited to; framing, drywall, paint, flooring, ele... | 02/24/2021 | 03/19/2021 | |
| Design Services Redmond SD 3/12/21 2pm The Redmond School District is seeking to select Architects to provide the services described herein... | 02/26/2021 | 03/12/2021 | |
| Neighborhood Street Safety Program 3/17/21 3pm This work includes the construction and installation of new pavement markings, signs, concrete curbs... | 03/17/2021 | ||
| CM/GC Camas Ridge Elementary 3/9/21 11am This RFP is for CM/GC services during both the pre-construction and construction phases of the new 7... | 02/23/2021 | 03/09/2021 | |
| Williamette 20th & Oak 2-Way Conversion 3/4/21 2pm Repaving/signing/striping of Willamette from 18th to 20th, Oak from 19th to 20th, and 20th from Will... | 03/04/2021 | ||
| Duff Ozone Equipment & Start Up 3/18/21 11am Medford Water Commission (COMMISSION) is seeking a vendor to provide ozone equipment and start-up se... | 03/18/2021 | ||
| SW 6th Street Extension 3/17/21 2pm Installation of approx. 440 LF of new 12” Ductile Iron Waterline, 440 LF of 8” PVC sewer line, new s... | 03/17/2021 | ||
| Worthington Road Improvements 3/9/21 10am The work under this project includes all materials, labor, and equipment necessary for earthwork, gr... | 03/09/2021 | ||
| Coos Bay Rail Line Post Replacement 3/31/21 4pm This Project consists of the removal of six deteriorated posts and replacement with new, a total of ... | 02/24/2021 | 03/31/2021 | |
| Title | Site Walk Through | Deadline |