| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Wireless Equipment Upgrade 2/25/21 4pm Provide products and/or services for the Wireless Equipment Upgrade project (2021). The District see... | 02/25/2021 | ||
| Network Equipment Upgrade 2/25/21 4pm Provide products and/or services for the Network Equipment Upgrade project (2021). The District seek... | 02/25/2021 | ||
| Riverfront Watermain ext. Phase II 2/17/21 2pm Extension of a 42″ water main located on the University of Oregon’s riverfront property ... | 02/17/2021 | ||
| District 7 Sutherlin MIM Paving 2/16/21 3pm Complete Cold Plane Pavement Removal of asphalt concrete surface, furnish and place Emulsified Aspha... | 02/16/2021 | ||
| Tree & Veg Clearing OR238 MP32-33 2/11/21 3pm Furnish material, equipment, and labor to fall trees, trim tree canopy, remove vegetation, chip mate... | 02/11/2021 | ||
| Stormwater Facility & Taxiway Removal 3/2/21 2pm Demolition of the existing Taxiway B3 and the constructionof two separate stormwater facilities: an ... | 02/11/2021 | 03/02/2021 | |
| Engineering & Environmental Pump House 1 2/26/21 3pm Provide environmental consulting and professional design services for the Pump House #1 Generator Pr... | 02/26/2021 | ||
| 20/30 Park Renovation 3/5/21 5pm The Project scope and needs include the design of multi-use athletic courts including volleyball, pi... | 02/16/2021 | 03/05/2021 | |
| Chinese Immersion Program Renovation 2/18/21 2pm Renovation of classrooms in the existing Buildings C, E, F, and G at Kennedy Middle School to accomm... | 02/09/2021 | 02/18/2021 | |
| Seabreeze & Lake Ct. Storm Drain Replace 2/25/21 2pm The Project entails two Schedules for removal and replacement of storm drain line, rehabilitation of... | 02/16/2021 | 02/25/2021 | |
| Title | Site Walk Through | Deadline |