| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Hooker Rd. Sewer Project #2 3/8/21 2pm The proposed work generally consists of construction of approximately 1,000 LF of small diameter sew... | 03/08/2021 | ||
| Lincoln St. Curb Ramp Improvements 3/4/21 2pm The work proposed consists of ADA improvements and associated work in the City of Roseburg. ADA impr... | 03/04/2021 | ||
| Fisheries Modular Building 3/8/21 4pm The facility will be replaced with a customized space that is a minimum of 1,800sqft for offices, la... | 03/08/2021 | ||
| Multisite Painting 3/4/21 2pm Preparing and painting the exterior of entire school buildings and site elements, and application of... | 02/17/2021 | 03/04/2021 | |
| Geocomposite Short Mountain Landfill 3/3/21 3pm Lane County is seeking quotes for 2-sided Geocomposite (Geonet heat bonded between two layers of non... | 03/03/2021 | ||
| OR238 & OR62 Curb Ramps 3/4/21 9am The Work to be done under this Contract consists of the following: 1. Install and remove temporary t... | 03/04/2021 | ||
| US101 MP 358 Chetco Bridge Tree & Brush 2/17/21 2pm Fall, chip, and remove ALL trees and brush larger than 1″ in diameter in the flagged area on t... | 02/17/2021 | ||
| Parking Lot Maintenance & Repair 3/2/21 3pm Asphalt parking lot crack filling, sealcoating, asphalt patching, and ADA symbol marking and line st... | 02/23/2021 | 03/02/2021 | |
| Britt Hall Commissioning Services 2/25/21 3pm The following systems and assemblies (including all associated equipment, features and components) w... | 02/25/2021 | ||
| I-5 Brushing MP 79 2/16/21 2pm ESB project for clearing, trimming and removing trees, brush, and all other vegetation to improve si... | 02/16/2021 | ||
| Title | Site Walk Through | Deadline |