| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Stewart Parkway End Panel Repair 3/30/21 2pm Construction of replacement of the bridge end panels of the Stewart Parkway Bridge. | 03/25/2021 | ||
| Madison Elementary School Renovation 4/1/21 4pm The Project consists of major renovations to the existing Madison Elementary School Building. The ex... | 03/12/2021 | 04/01/2021 | |
| 2021 Pavement Maintenance Sisters 3/17/21 2pm Improvements generally include grind & inlay of asphalt pavement on portions of Main Avenue as w... | 03/17/2021 | ||
| COIC RFQ for A & E Services 3/19/21 4pm This project will be to design & engineer permanent bus stop pads, signage, benches, shelters &a... | 03/19/2021 | ||
| Lava River Cave Trail Construction 3/26/21 4pm The Lava River Cave Trail project involves removal and replacement of the existing perimeter fence s... | 03/26/2021 | ||
| High Banks & Thurston Rd. 3/18/21 2pm Mill and pave High Banks Rd. (Hwy 126 to 58th Street), 58th Street (High Banks Rd. to roundabout), a... | 03/08/2021 | 03/18/2021 | |
| CM/GC Knight Campus 4th Floor West Surgery 3/17/21 2pm Pre-construction and construction services related to the Knight Campus Fourth Floor West Surgery Su... | 03/05/2021 | 03/17/2021 | |
| Lower Rogue Estuary Enhancements 3/29/21 3pm Access the restoration (Krambeal Creek Sough and Indian Creek Off-Channel) sites with equipment, wor... | 03/10/2021 | 03/29/2021 | |
| Dollar General Roseburg 3/19/21 5pm Ground up construction of Dollar General in Tenmile, Or. | 03/19/2021 | ||
| Rose Court Apartments 3/16/21 2pm Project includes: cast in place concrete, cast underlayment, Metal fabrication, stairs, & pipe &... | 03/16/2021 | ||
| Title | Site Walk Through | Deadline |