| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| A & E Admin/Ops Building Upgrades 4/14/21 3pm The purpose of this document is to provide interested parties with information to enable them to pre... | 04/14/2021 | ||
| Roadway Striping Rumble Strip Install 3/30/21 10am The approximate quantities are: rumble strips (Continuous Rumble Strips), longitudinal pavement mark... | 03/30/2021 | ||
| Oil Rock, Sanding Rock Various Sites 3/23/21 10am The approximate quantities are: 1/4” – #10 sanding rock in stockpile, 2,700 Tons; 3/8” –... | 03/23/2021 | ||
| Elkton Elementary Phase II 4/1/21 3pm Construction of a 17,000 + sq ft. gym/classroom, including site preparation. The new building is a p... | 04/01/2021 | ||
| GP Oil Stop & Car Wash 3/17/21 2pm Ground up construction of car wash and oil stop. Specs are included with the plans. | 03/17/2021 | ||
| Chemult Maintenance Shop Asbestos 3/24/21 11am Project Scope: To provide all labor, equipment, materials, and permits/engineering to Remove or abat... | 03/24/2021 | ||
| Windsor Cir. 36th & 38th Pavement 3/19/21 2pm Roadway reconstruction on Windsor Circle with stormwater and wastewater repairs. Pavement Overlay on... | 03/19/2021 | ||
| Half Moon Bay Shop Flatwork 3/30/21 2pm Clear and grub work area; install and maintain temporary erosion control; perform earthwork; prepare... | 03/12/2021 | 03/30/2021 | |
| Tank 1 & Roseburg Water System Project 5/4/21 2pm The Project consists of construction of approximately 8,300 feet of 12-inch water main, one welded s... | 03/15/2021 | 05/04/2021 | |
| Replace BMF Heaters at USCG Coos Bay 3/30/21 5pm Replace existing hydronic boiler with new energy efficient hydronic boiler in Boat Maintenance Facil... | 03/15/2021 | 03/30/2021 | |
| Title | Site Walk Through | Deadline |