| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Westmoreland Seismic Rehab 5/18/21 2pm Seismic Rehab involving demo, metal fabrication, carpentry, framing, casework, roofing, insulation, ... | 04/14/2021 | 05/18/2021 | |
| I-5 Culvert MP 171 Repair 4/28/21 2pm Perform invert paving on a large culvert under I-5 in Lane County for the benefit of the Oregon Depa... | 04/28/2021 | ||
| OR66 MP 53-58 Paving Project 4/21/21 2pm Construct an asphalt concrete pavement (“ACP”) inlay from Kern Swamp Rd. MP 53.68 –... | 04/21/2021 | ||
| I-5 MP 85 Culvert Repair Rebid 4/20/21 3pm Culvert repair and replacement including traffic control and construction of temporary water managem... | 04/20/2021 | ||
| Enhance & Expand Parking Lot Areas 5/6/21 1:00pm Excavation of existing parking lots and regrading to accommodate ADA standards Reconfiguring traffic... | 04/19/2021 | 05/06/2021 | |
| West 13th Ave. & Dani St. Stormwater 4/22/21 2pm 563 CY General Excavation; 1 LS Clearing and Grubbing; 40 FT Drain Pipe, 6 Inch Perforated PVC w/Fil... | 04/22/2021 | ||
| Murphy Booster Pump Station 5/5/21 2pm Expand the pumping capacity of the existing Murphy Pump Station to cover a more broad flow range. N... | 05/05/2021 | ||
| UO Ponisio Lab & 3rd Floor 4/23/21 12pm Build new wall to divide 368 into two separate labs. New flooring, casework, lighting and utilities ... | 04/23/2021 | ||
| Douglas Electric Co-Op 5/4/21 2pm New construction of a 2-story 14,250 sqft office building, and adjacent 8,000 sqft Pre-Engineered Me... | 04/20/2021 | 05/04/2021 | |
| Eugene Town Square Parking Demo 4/20/21 2pm Scope includes demolition of a partial subgrade, 2 level concrete parking garage, associated utiliti... | 04/20/2021 | ||
| Title | Site Walk Through | Deadline |