| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Shasta & Alta Vista All Way Stop 5/5/21 10am South Shasta Ave at Alta Vista Rd – All Way Stop, City of Eagle Point. Project includes Striping, Pa... | 05/05/2021 | ||
| Thoroughman Barn 5/21/21 5pm Bids needed for metal roof & flashing. Project began 4/28. Roof installation needed approximatel... | 05/21/2021 | ||
| Install Solar Panels Equip Enclosures 6/11/21 5pm Installation of site solar panels and peripheral equipment enclosures. Services will include prepari... | 06/11/2021 | ||
| Fabrication for Peripheral Enclosures 5/28/21 5pm Fabrication of aluminum enclosures to house seismic equipment and its ancillary systems, including t... | 05/28/2021 | ||
| City Fueling Station 5/27/21 2pm This project consists of constructing a new City owned fuel facility at the corner of Wood and L Str... | 05/13/2021 | 05/27/2021 | |
| 4th St. Paving & Restoration 5/5/21 2pm Includes excavation, curb & gutter remove/replace, asphalt & tack coat. | 05/05/2021 | ||
| Padmount Switch 25kv 5/6/21 2pm This specification covers three phase dead-front, 25 kV air insulated padmount switchgear used on Sp... | 05/06/2021 | ||
| Electrical Deficiencies Roseburg VA 5/26/21 2pm Contract is to correct electrical deficiencies campus wide at the Roseburg VAMC. Price Range: $5 to ... | 05/26/2021 | ||
| Jewett Dr. Stormwater & Waterline 5/25/21 2pm This project consists of creek restoration, storm drainage improvements, water distribution system i... | 05/25/2021 | ||
| OSU Arts & Education Complex #1 5/19/21 2pm Prepare the existing site for the future Arts and Education Complex (“AEC”) Project. Located at the ... | 04/30/2021 | 05/19/2021 | |
| Title | Site Walk Through | Deadline |