| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| North Umpqua Radio Tower 6/16/21 4pm This project will build a pad for an 80-ft Rohn Tower (Government furnished), connect utilities (inc... | 06/16/2021 | ||
| Graham Field Offices Residing Project 6/9/21 2pm The Project consists of exterior building envelope repairs. The Work includes selective demolition, ... | 06/02/2021 | 06/09/2021 | |
| 2021 Drywell Elimination Program 6/10/21 2:30pm The scope of work for this contract includes: – Cleaning existing stormwater system – De... | 06/10/2021 | ||
| Amazon Prarie Mitigation Bank 6/15/21 1pm The scope of work for this contract includes: – Preservation and protection of existing sensit... | 06/15/2021 | ||
| COID Pilot Butte Small Diameter Pipe 7/1/21 2:00pm Piping currently open irrigations canals in multiple segments. This includes piping of the mainline ... | 07/01/2021 | ||
| COID Pilot Butte Canal Precast Concrete 7/1/21 2:00pm Piping currently open irrigations canals in multiple segments. This includes piping of the mainline ... | 07/01/2021 | ||
| E 40th Ave Storage Tank Tree Remove 6/10/21 2pm The project will require the removal and disposal of approximately 265 trees, installation of 1,700 ... | 06/02/2021 | 06/10/2021 | |
| Platt Ave Curb Gutter Paving 6/15/21 11am Curb and Gutter, Paving, Grading | 06/15/2021 | ||
| ERD Parcel 3BC MEP Design Build 6/14/21 2pm The project is four-story apartment building that is “C” shaped in plan with an area of approximatel... | 06/14/2021 | ||
| Southwest Airlines Offices 6/8/21 2:30pm Tenant improvements at ground and upper floors of the A Gates area and minor work at the baggage han... | 06/01/2021 | 06/08/2021 | |
| Title | Site Walk Through | Deadline |