| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| South County Paving 2021 6/2/21 2pm Construct roadway improvements on the following Curry County roads: Chapman Lane, Crestline Loop, Ti... | 06/02/2021 | ||
| I-5 Brushing NB & SB MP14-30 5/20/21 2pm Brush and remove vegetation along the Southbound and Northbound right-of-way of Interstate 5 between... | 05/12/2021 | 05/20/2021 | |
| Reduced Pressure & Gravity Zone Design 6/4/21 3pm Provide engineering consultation on a multi-phase, multi-year project to assist in the design and co... | 06/04/2021 | ||
| Klamath Co. Courthouse Office Remodel 6/15/21 2pm • Remove an existing high-density filing storage system (center section of rolling file shelves) and... | 05/18/2021 | 06/15/2021 | |
| Storm Rehab Brooklyn Ave 6/3/21 2pm Storm line rehabilitation of approximately 365 lineal feet of 48 inch diameter and 515 lineal feet o... | 06/03/2021 | ||
| Propane Generator Install 5/21/21 5pm Remove existing propane generator and install new 45KW propane generator at the Headway Building loc... | 05/21/2021 | ||
| Manzanita Hills H2O Arsenic Treatment 6/9/21 2pm Replacing the current arsenic treatment system in the pump house located on Cindy Way. The proposed ... | 05/26/2021 | 06/09/2021 | |
| Trail Bridge Reservoir Program 6/1/21 2pm Two Bid Packages: Demo/Earthwork/Exterior Improvements/Utilities Concrete/Site furnishings | 05/18/2021 | 06/01/2021 | |
| HWY101 Inversion Lining Project 6/8/21 2pm a. Install inversion lining in approximately 940 lineal feet of existing 8-inch sewer lines at vario... | 06/08/2021 | ||
| I & I Removal Project 6/8/21 3pm a. Install inversion lining in approximately 3,820 lineal feet of existing 8-inch to 10-inch sewer l... | 06/08/2021 | ||
| Title | Site Walk Through | Deadline |