| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Stillwater Business Park Lighting 7/15/21 3pm Install seven street lights along the south side of Venture Parkway from Old Oregon Trail to Stillwa... | 07/15/2021 | ||
| Carr Fire Buenaventura Bridges 7/30/21 3pm Install nine pedestrian bridges along the Buenaventura Trail that were burned during the 2018 Reddin... | 07/30/2021 | ||
| Single Phase Distribution Transformers 7/19/21 3pm SINGLE-PHASE, PAD-TYPE DISTRIBUTION TRANSFORMERS 12kV-240/120V, Single Phase | 07/19/2021 | ||
| Big Butte Springs Watershed Logging 7/27/21 2pm Commercial thinning will be focused on an area approximately 180 acres in size, east of and immediat... | 07/27/2021 | ||
| Remove & Replace HVAC Lava Beds 7/28/21 2pm The National Park Service, Lava Beds National Monument, has the requirement for the removal of exist... | 07/28/2021 | ||
| Fairchild Medical Lobby Remodel 9/29/21 12pm Project consists of partial demolition of an existing administration space, lobby, partial corridoor... | 09/29/2021 | ||
| Campus Dr. Dan O’Brien Roundabout 8/3/21 1pm Construction of a roundabout at the intersection of Campus Drive and Dan O’Brien Way. Work includes ... | 07/01/2021 | 08/03/2021 | |
| RFQ Engineering Svcs. Wastewater System 8/5/21 4pm The City of Grants Pass desires to select an engineering firm to enter into a five-year Master Servi... | 07/14/2021 | 08/05/2021 | |
| Coos Co. Paving Project 7/20/21 2pm Mobilization and demobilization • Traffic Control • Install temporary flexible pavement markers as n... | 07/20/2021 | ||
| Winchester Bay Crab Dock Repairs 7/27/21 2pm Repair damage to Winchester Bay Crab Dock caused by FEMA event. | 07/08/2021 | 07/27/2021 | |
| Title | Site Walk Through | Deadline |