| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Main St. Sewer Interceptor 7/29/21 2pm The Project consists of installing 915 feet of 20-inch, 910 feet of 18-inch gravity sewer main insta... | 07/08/2021 | 07/29/2021 | |
| Southern Coos Hospital Roof Replace 7-21-21 2pm Replacement of the roof of the Southern Coos Hospital & Health Center. | 07/06/2021 | 07/21/2021 | |
| US20 Mervin Sampels – Greenwood 7/29/21 9am Construct curbs, sidewalks and ADA ramps. Install new signing and striping, illumination, signals an... | 07/29/2021 | ||
| Highway 97 Fencing MP 179-183 7/22/21 11am Work includes installing wildlife fencing on the East and West sides of Hwy 97 between MP 179.97 and... | 07/22/2021 | ||
| Willamette SSFP Improvements 8/5/21 2pm Excavation for & construction of cast-in-place concrete curb wall, as indicated in drawings. B. ... | 07/07/2021 | 08/05/2021 | |
| RCU Steel & Metal Building 7/13/21 5pm New Construction of a single story pre-engineered metal building and storage build-outs for the R... | 07/13/2021 | ||
| Brussells St. Pavement Replace 7/21/21 2pm Remove approximately 5000 SY of existing asphaltic concrete surface and pave back 900 tons of Level ... | 07/13/2021 | 07/21/2021 | |
| New Jet-A Fueling System Rebid 8/17/21 2pm Fabricate and install NEW JET-A AIRCRAFT FUELING SYSTEM EQUIPMENT at the Grants Pass Airport. Major ... | 08/17/2021 | ||
| Half Moon Bay Shop Building 7/27/21 2pm Construction of a shop building 30 feet by 62 feet per engineered drawings | 07/27/2021 | ||
| US97/US20 Bend N Corridor Design Build 8/18/21 9am This re-evaluation assesses the effect of environmental statutes, regulations, policies and guidance... | 08/18/2021 | ||
| Title | Site Walk Through | Deadline |