| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
MSD Update/Replace Pneumatic Components 4/20/21 2pm
Updating/replacing remaining pneumatic actuators and controls to dual duct boxes with digital com... |
03/31/2021 | 04/20/2021 | |
|
Oak Valley Sewer Reconstruction 4/13/21 2:15pm
Construction of approximately 3,100 feet of 8 inch gravity sewer, along with associated manholes ... |
04/06/2021 | 04/13/2021 | |
|
Storm Damage Shively Road 4/27/21 2pm
The work to be done consists of traffic control systems, rock buttresses, culvert replacement, re... |
04/27/2021 | ||
|
Storm Damage Repair Mattole Rd 36.06, 36.16 4/27/21 2pm
The work to be done consists of consists of traffic control systems, clearing and rubbing, removi... |
04/27/2021 | ||
|
Hamilton Walton Transformation Project 4/15/21 2pm
Fortis Construction is seeking proposals for the University of Oregon (UO) Hamilton Walton Reside... |
03/31/2021 | 04/15/2021 | |
|
A & E Karuk Tribe Medical Clinic 4/6/21 5pm
The Contracted Design Firm will work, with Tribal employees’ input, to submit 100% |
04/06/2021 | ||
|
Water Meter Transmission Units 4/21/21 2pm
Purchase of Aclara RF 3400 Water Meter Transmission Units (MTU). The initial term of the awarded ... |
04/21/2021 | ||
|
OSU Cascades AB2 Site Infrastructure 4/12/21 2pm
|
04/12/2021 | ||
|
Steel Visitor Center Renovations 4/28/21 1pm
The work consists of the rehabilitation of the Steel Visitor Center, which is located in the Muns... |
04/28/2021 | ||
|
Design Build WTP Replace 5/24/21 3pm
Description: |
04/12/2021 | 05/24/2021 | |
| Title | Site Walk Through | Deadline |