| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Human Services Design Build 9/30/21 5pm Design-Build Proposals for design & construction for the renovation of one existing 4,149 squar... | 09/15/2021 | 09/30/2021 | |
| Shasta Place Apartments Remodel 10/7/21 2pm The project will be a remodel of the exterior and interior of Shasta Place Apartments located at 151... | 10/07/2021 | ||
| Fuel Pad Parking Cover 9/21/21 2pm The work in general consists of providing all material, labor and equipment necessary to complete th... | 09/07/2021 | 09/21/2021 | |
| Parking Structure Security Upgrade Rebid 9/14/21 2pm Project consists of security upgrades to the parking structure located at 600 Pearl St. Eugene, incl... | 09/14/2021 | ||
| Boiler Safety Device Testing 9/10/21 5pm Furnish the necessary personnel, material & expertise to provide Annual Boiler Plant Safety Devi... | 09/10/2021 | ||
| Medford SD Gym Seismic Retrofit 9/22/21 2pm Work includes but not limited to: Demolition, Concrete, Masonry, Structural Steel Framing, Steel Dec... | 09/08/2021 | 09/22/2021 | |
| Duff WTP Ozone Equipment 9/21/21 2pm Removal of existing Ozone System Equipment and installation of the new Owner provided Ozone System E... | 09/21/2021 | ||
| Southern Oregon Seismic Bridge Retro Ph 2 9/16/21 9am 1. Install and remove temporary traffic control and erosion control measures. 2. Install and remove ... | 09/16/2021 | ||
| US20 Ward/Hamby Intersection 9/16/21 9am 1. Construct earthwork and drainage for a new roundabout. 2. Construct pavement, curbs, walks and is... | 09/16/2021 | ||
| Pond 1 Sludge Removal 9/7/21 2pm Stockpile, load and haul approximately 17,400 cubic yards (or 16,000 tons) of biosolids from the SSS... | 09/07/2021 | ||