| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Historic Bowerman Roof Replacement 9/7/211pm The purpose of this project is to improve the roofing condition at Bowerman Barn. This will include ... | 09/07/2021 | ||
| Garden Grove Apartments 9/30/21 3pm This is a remodel of the site, exterior, and interior of an existing 60 unit apartment complex with ... | 08/24/2021 | 09/30/2021 | |
| Court St. Storm Drain Replace 8/31/21 3pm Replace approximately 120 linear feet of corrugated metal pipe arch with 36-inch reinforced concrete... | 08/31/2021 | ||
| U of O Knight Campus 4th Floor Surgery 8/31/21 2pm The Project consists of the construction of Renovation to existing 4th floor West wing laboratory su... | 08/18/2021 | 08/31/2021 | |
| Big Sky Park Improvements 9/16/21 2pm Project consists of construction of roadways, parking, pathways & plaza spaces, installation of ... | 09/16/2021 | ||
| Re-Roofing Crater Lake National Park 8/24/21 2pm The National Park Service, Crater Lake National Park, has a requirement for the re-roofing of buildi... | 08/24/2021 | ||
| Jacksonville Fire Station Seismic 2nd Story 9/9/21 2pm Demolition of the majority of the existing 3,321 square foot fire station, with only 3 exterior wall... | 09/09/2021 | ||
| Howard Prarie Resort New Marina Pilings 9/13/21 10am The work under this project includes installation of pilings for a marina on Howard Prairie Reservoi... | 09/13/2021 | ||
| Conduit Install T Street 8/23/21 2pm Work will include, but not limited to, a bore of one (1) two-inch (2”) conduit installed per SUB spe... | 08/16/2021 | 08/23/2021 | |
| Conduit Install Hayden Bridge 8/25/21 2pm Install underground facilities consisting of one 2″ & one 3″ schedule 40 conduit on ... | 08/18/2021 | 08/25/2021 | |
| Title | Site Walk Through | Deadline |