| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| CM/GC Work Package 2 Redmond Library 9/8/21 2pm Deschutes Public Library District (District) is seeking Proposals from qualified Contractors to perf... | 08/25/2021 | 09/08/2021 | |
| CM/GC Work Package 1 Central Library 9/8/21 2pm Deschutes Public Library District (District) is seeking Proposals from qualified Contractors to perf... | 08/25/2021 | 09/08/2021 | |
| Main St. Water System Improvement 9/21/21 2pm The Project consists of installing 120 feet of 16-inch, 170 feet of 10-inch, 10,540 feet of 8-inch, ... | 09/21/2021 | ||
| Therapeutic Mindfulness Garden **Cancelled** The Department of Veterans Affairs, VA Medical Center in Roseburg, Oregon has a requirement for a Co... | 08/31/2021 | ||
| S 6th St. Viaduct Improvement 9/9/21 4pm The City is seeking a qualified consultant or consultants to design improvements to the South 6th St... | 09/09/2021 | ||
| Fred Meyer Springfield 8/26/21 10am Interior remodel of an existing Fred Meyer Grocery Store in Springfield, OR. | 08/26/2021 | ||
| Weed USD DSA Project Inspector 9/8/21 3pm Weed Union Elementary School District (“District”) is requesting proposals for an on-site DSA Projec... | 09/08/2021 | ||
| Historic Bowerman Roof Replacement 9/7/211pm The purpose of this project is to improve the roofing condition at Bowerman Barn. This will include ... | 09/07/2021 | ||
| Garden Grove Apartments 9/30/21 3pm This is a remodel of the site, exterior, and interior of an existing 60 unit apartment complex with ... | 08/24/2021 | 09/30/2021 | |
| Court St. Storm Drain Replace 8/31/21 3pm Replace approximately 120 linear feet of corrugated metal pipe arch with 36-inch reinforced concrete... | 08/31/2021 | ||
| Title | Site Walk Through | Deadline |