| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| KTHA Stove Cleaning 9/24/21 5pm All necessary materials, labor, equipment, permits, and fees needed to annually clean and inspect wo... | 09/24/2021 | ||
| Yreka Security Fence Upgrades 9/21/21 1pm Repair/Replace chain link fence, razor wire, barbed wire, barbed wire arms, structure weight posts w... | 09/21/2021 | ||
| EWEB 3 Phase Substation Regulators 10/7/21 2pm Two 1500/2000 KVA 3φ step voltage regulators that are to be matched with 12/16/20 MVA 115-1... | 10/07/2021 | ||
| 2021 Paving Eagle Point 9/21/21 2:30pm This project consists of furnishing all labor, equipment, and materials necessary for paving the str... | 09/21/2021 | ||
| Table Rock Motel Phase 2 9/28/21 5pm Replace & add units to the existing Table Rock Motel and other improvements. The buildings consi... | 09/28/2021 | ||
| Landfill Leachette Pre-Treatment Plant 11/9/21 2pm The construction of a new Leachate Pre-Treatment Plant at the Roseburg Landfill, including the suppl... | 11/09/2021 | ||
| Architectural Design New Residence Hall 10/12/21 1pm Architectural and engineering design and construction administration services are required through t... | 09/23/2021 | 10/12/2021 | |
| 3 Phase Pad Type Transformers 9/28/21 3pm It is the intent of these specifications to obtain, for the City of Redding Electric Utility, transf... | 09/28/2021 | ||
| Supply & Deliver Generators Whiskeytown 9/16/21 2pm Supply and delivery nine (9) backup generators and nine (9) transfer switches. | 09/16/2021 | ||
| 2021 Chipseal Project 9/16/21 2pm The Project involves two (2) City streets, two (2) parking lots and an area at the City corporation ... | 09/09/2021 | 09/16/2021 | |
| Title | Site Walk Through | Deadline |