| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Chemical Injection Sprayer 10/14/21 2pm Purchase of one (1) chemical injection sprayer. | 10/14/2021 | ||
| Pithvuyram Center Remodel 9/27/21 4pm THE EXISTING KARUK “OLD GYM”, WHICH IS 3,704 SQUARE FEET, WILL BE RENOVATED INTO A COMMU... | 09/27/2021 | ||
| RCC Ceramics Building Redwood Campus 10/11/21 2pm Renovation of an existing 1,792 sqft building that will be referenced as the Redwood Campus Ceramics... | 09/28/2021 | 10/11/2021 | |
| California Alley Utility Improve 10/14/21 3pm Replace approximately 1,560 feet of sewer main within the California Street Alley and Yuba Street. P... | 10/14/2021 | ||
| Design Build Winston Dillard SD Offices 11/4/21 2pm The building must have twelve (12) offices as detailed: 1. Superintendent office with room for a con... | 11/04/2021 | ||
| Evergreen Family Medicine Office 10/7/21 4pm Adroit Construction Company is seeking subcontractor bids for work including but not limited to: Fin... | 10/07/2021 | ||
| Peoples Irrigation Pipe Install 10/5/21 2pm Mobilize, perform selective demolition, install a furnished approximate 1,893 LF of 48-inch diameter... | 09/23/2021 | 10/05/2021 | |
| Water Quality Improvements Project 10/19/21 2pm Construct a new chemical storage and dosing building at the Robert A. Duff Water Treatment Plant (Du... | 10/19/2021 | ||
| Solid Waste Beaver Hill Fence Project 10/5/21 2pm Install new 7-foot chain link fence including all hardware, post, rails, and braces with new three s... | 09/16/2021 | 10/05/2021 | |
| 7th & Minnesota Road Rehab 9/28/21 2pm South 7th Street Road Rehabilitation – Work includes new asphalt concrete pavement, aggregate ... | 09/28/2021 | ||
| Title | Site Walk Through | Deadline |