Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Bridge Replacement McCullough Creek 3/26/21 2pm
The project scope includes the design and construction of a new bridge to replace the existing br... |
03/26/2021 | ||
|
Liquid Roads Ultra Project 3/3/21 2pm
Consists of approximately 384,840 Sq Ft (42,760 Sq Yd) of surface treatment, with an engineer’s... |
03/03/2021 | ||
|
Central Avenue Sidewalk Extension 2/24/21 2pm
The project consists of constructing 700+/- linear feet of new six-foot wide sidewalk, including ... |
02/24/2021 | ||
|
Lakeview Smiles 3/1/21 5pm
This is a new ground up construction project in Lakeview. The building is about 4700 square ft. | 03/01/2021 | ||
|
US199 Rogue River to Applegate 3/11/21 9am
The Work to be done under this Contract consists of the following: |
03/11/2021 | ||
|
Message Sign Upgrades Project 2/25/21 9am
The Work to be done under this Contract consists of the following: |
02/25/2021 | ||
|
2021 Misc Overlays 2/24/21 10am
The work under this project includes all material, labor, and equipment necessary for paving, per... |
02/24/2021 | ||
|
Hamrick Rd Signal & Construction 3/11/21 2pm
There are two projects associated with this RFP. The first is a signal modification and turn la... |
03/11/2021 | ||
|
USPS Main Post Office 2/23/21 4pm
The project involves the renovation of approx. 2,703 SF of unused basement space for USPIS Domici... |
02/23/2021 | ||
|
2021 District 7 Azalea MIM Paving 2/18/21 3pm
Cold plane pavement removal of asphalt concrete surface, furnish and place emulsified asphalt tac... |
02/18/2021 | ||
| Title | Site Walk Through | Deadline |