| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| I-5 Median Blackwell Summit MP 38.5 11/16/21 2pm Remove and Reinstall Concrete Median Barrier on Interstate 5 at Blackwell Summit MP 38.5. | 11/16/2021 | ||
| Circuit Breakers 12/1/21 2pm 115kV/230kV circuit breakers | 12/01/2021 | ||
| Fern Ridge Water Tanks 11/12/21 5pm Installation of two – 10,000 gallon water storage tanks on Richardson Butte at Fern Ridge Lake. This... | 11/12/2021 | ||
| Campus Dr. & Daggett Ave. Roundabout 12/9/21 2pm Work shall include but no necessarily be limited to the following: constructing a concrete roundabou... | 11/16/2021 | 12/09/2021 | |
| Weed Elementary Food Services Rebid 11/17/21 2pm Installation of food service equipment/appliances and related work. | 11/17/2021 | ||
| Playground Equipment Multiple Parks 11/19/21 3pm Provide playground equipment to the City of Redding to replace existing or removed equipment at Indi... | 11/19/2021 | ||
| DHHS ADA Modifications 11/16/21 2pm Interior lobby and restroom ADA improvements and exterior construction including parking and path of... | 11/02/2021 | 11/16/2021 | |
| Fire Detection at Carmen Powerhouse 11/17/21 2pm Provide and install fire detection systems at EWEB’s hydroelectric project at Carmen-Smith in ... | 11/03/2021 | 11/17/2021 | |
| Carmen Bridge Seismic Upgrade 12/1/21 2pm Engineering services for Carmen-McKenzie River Bridge Improvements, located at the Carmen-Smith Hydr... | 12/01/2021 | ||
| SSFP Re-Sand Filter Bed 11/3/21 2pm The Supplier will produce high quality NSF 61 certified filter media to replenish filter beds at the... | 11/03/2021 | ||
| Title | Site Walk Through | Deadline |