| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Baker Downtown Center Roof Asbestos 3/15/22 2pm Asbestos abatement and demolition on the south Area F of the Baker Center Building in conjunction wi... | 03/03/2022 | 03/15/2022 | |
| Vegetation Management McKenzie Corridor 3/14/22 2pm Contractor shall perform vegetation maintenance and enhancement primarily through the use of power e... | 03/14/2022 | ||
| High Speed Network Connectivity 3/22/22 2pm Provide, install and maintain, High-Speed Network Connectivity via Ethernet transport at speeds of e... | 03/01/2022 | 03/22/2022 | |
| College Union HVAC Design Svcs. 3/15/22 1pm The purpose of this RFQ is to solicit proposals for engineering design services and project administ... | 02/22/2022 | 03/15/2022 | |
| John F Moehl Stadium Landscape & Irrigation 3/22/22 1pm The project includes areas of landscape edging, weed barrier and decomposed granite coverings; stack... | 02/24/2022 | 03/22/2022 | |
| Douglas Co. SD Cisco Wireless Access Points 3/22/22 2pm Douglas County School District No. 4 seeks sealed bids for Cisco wireless access points. This procur... | 03/22/2022 | ||
| LaPine Water & Wastewater Improve 3/17/22 2pm Work for this Project involves three schedules: Schedule A – Wastewater Treatment Facility and... | 03/03/2022 | 03/17/2022 | |
| Yreka Community Theatre HVAC 3/16/22 2pm The project includes, but is not limited to: Replacing the existing HVAC system; installing heat pum... | 03/02/2022 | 03/16/2022 | |
| Lincoln Middle School Seismic Retrofit 3/11/21 4pm The seismic retrofit of Lincoln Middle School includes the rehabilitation to the existing lateral sy... | 02/25/2022 | 03/11/2022 | |
| Ashland WWTP Outfall Relocation 3/8/22 2pm The Project contemplated consists of installation of approximately 2,000 linear feet of 30 inch and ... | 02/23/2022 | 03/08/2022 | |
| Title | Site Walk Through | Deadline |