| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Butler Market Wells & Boyd Acres Improve 3/29/22 3pm Provide the design services necessary for the Butler Market & Wells Acres & Boyd Acres Impro... | 03/29/2022 | ||
| CBNB Water Board Project 3/17/22 2pm Work consists of wall repair, casework replacement, Diebold window and door coordination, ballard in... | 03/07/2022 | 03/17/2022 | |
| SSSD Phase 4 Sewer Line Rehab 3/15/22 2pm Complete 27 lateral rehabilitations and 4,629 lineal feet of cured in place sewer pipe repairs. | 03/15/2022 | ||
| Design Build Muni Pool Replace 3/7/22 2pm This request for proposals is for a design-build contract intended to replace the existing pool reci... | 03/07/2022 | ||
| 2022 Lane Co. Slurry Seal Project 3/15/22 10am The approximate quantities are: 275,000 square yards of Type II Slurry Seal and all other work calle... | 03/15/2022 | ||
| 2022 Site Improvement Modoc HS 3/15/22 2pm The work at Modoc High School consists of Surface preparation and 2 inch HMA overlays; performing Tr... | 03/01/2022 | 03/15/2022 | |
| Brophy Pump Station Abandonment 3/8/22 2:15 pm The construction of 1,305 feet of 8 inch gravity sewer, 647 feet of 4 inch pressure sewer, 6 manhole... | 03/02/2022 | 03/08/2022 | |
| Centennial Overlay Aspen to Prescott 3/16/22 2pm The Project consists of a pavement inlay; Americans with Disability Act (ADA) upgrades to existing c... | 02/28/2022 | 03/16/2022 | |
| Benton Airpark Runway Pavement 3/22/22 3pm The project includes rehabilitation of the runway and taxiway connectors which will include removal ... | 03/22/2022 | ||
| Landfill & Wetlands Project Short Mountain Landfill 3/22/22 10am For performing the earthworks, lining, and leachate collection and removal system for 8.49 ac Phase ... | 03/22/2022 | ||
| Title | Site Walk Through | Deadline |