| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Paving Alfalfa Market to Johnson Ranch 5/18/22 2pm The Class of Work of this Project is Asphalt Concrete Paving and Oiling. The value for this Contract... | 05/18/2022 | ||
| Phoenix Civic Center Temp Facilities 5/12/22 2pm Includes the renovation of approximately 3,000 square feet of the existing Civic Building to create ... | 05/12/2022 | ||
| ADA Curb Ramp Improve Phase 2 5/24/22 2pm The work to be done consists of traffic control system, roadway excavation, hot mix asphalt for shar... | 05/24/2022 | ||
| Grider Creek Campground Repair 6/1/22 5pm The project consists of installing a 4-inch gravel cap comprised of aggregate surface course to 46N2... | 06/01/2022 | ||
| District 7 Curbing Repair 5/10/22 3pm ESB Project. Remove existing curbing and construct new concrete drainage curbing at various location... | 05/10/2022 | ||
| Skinner Butte Park Steps Repair 5/24/22 4pm Two concrete step repair projects at the top and bottom of an existing trail near the Skinner Butte ... | 05/09/2022 | 05/24/2022 | |
| Baker Park Parking Lot Reconstruction 5/12/22 3pm The project will consist of installing of approximately 5 lineal feet of 8″ sanitary sewer pip... | 05/05/2022 | 05/12/2022 | |
| OIT Moehl Stadium Remodel 5/24/22 1pm The project includes implementing a new metal wall panel system for the entire exterior and replacem... | 05/24/2022 | ||
| Quick Quack Anderson 5/19/22 11am New 3,500 SF Car Wash; Trades required but not limited to; Survey, SWPPP, final clean, earthwork, as... | 05/19/2022 | ||
| White City Lagoon & Wetland Improvements 5/10/22 2:15 pm The construction of (3) three, one acre wastewater lagoons, impermeable liners, associated pipes, dr... | 05/04/2022 | 05/10/2022 | |