| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| High Tank Booster Pump Station 6/2/22 2pm This project consists, in general, of construction of a new potable water booster pumping facility i... | 05/17/2022 | 06/02/2022 | |
| Odem Medo Salmon Realignment 5/25/22 2pm Installation of approx. 2745 SY of new asphalt roadway, and 475 LF of new 8” DI waterline, new storm... | 05/25/2022 | ||
| Airport Terminal Roof Replace **Cancelled** Work shall include, but not necessarily be limited to: Remove existing roofing materials and replace... | 05/12/2022 | - | |
| Garden Ave. Apartments 5/18/22 2pm New construction of a 5-story apartments building in Eugene OR with 84 units. Scope includes but is ... | 05/18/2022 | ||
| Douglas HS Lower Parking Lot 6/21/22 3pm Project includes site development , including excavation, concrete, paving, landscaping, and irrigat... | 05/06/2022 | 06/21/2022 | |
| Douglas HS Culinary Classroom Rebid 8/2/22 3pm Project includes demolishing existing kitchen, classroom remodel, and updating sanitary lines and gr... | 08/02/2022 | ||
| Douglas HS Auditorium Refresh 5/25/22 3pm Building construction and remodeling, including general construction and electrical work. | 05/06/2022 | 05/25/2022 | |
| Transpacific Pkwy Drainage Improve 6/8/22 2pm The Work consists of, but is not limited to; traffic control, asphalt saw-cutting, asphalt grinding,... | 05/17/2022 | 06/08/2022 | |
| Polk St. Water Main Replace 5/19/22 2pm The construction and installation of 4190 feet of 8-inch ductile iron water main in Polk Street from... | 05/19/2022 | ||
| Oakdale Middle School Furniture 5/25/22 2pm School and office furniture for our new middle school, currently under construction. The new school ... | 05/25/2022 | ||
| Title | Site Walk Through | Deadline |