| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| 101 Drainage Curbing Repair 6/16/22 2pm Remove existing drainage curbing and construct new concrete drainage curbing along US101, at various... | 06/16/2022 | ||
| Water System Analysis Oregon Caves 6/9/22 5pm Conduct a chlorine contact time analysis on the water system at Oregon Caves National Monument &... | 06/09/2022 | ||
| Summit HS AV Project 6/16/22 2pm Supplying and installing approx. 55 classrooms with AV equipment. | 06/08/2022 | 06/16/2022 | |
| Bi-Directional Pavement Marker Project 6/21/22 2pm Project includes Mobilization and demobilization, Traffic Control and Install Yellow Bi-Directional ... | 06/21/2022 | ||
| 2022 Coos Co. Paving Project 6/21/22 2pm Project includes, Mobilization and demobilization, Traffic Control, Install temporary flexible pavem... | 06/21/2022 | ||
| Karuk Tribe Tree Removal 6/9/22 5pm 1. Fall approximately twenty-seven (27) trees of varying sizes with stumps/roots attached 2. Clear a... | 06/09/2022 | ||
| Cascade MS Replacement Rebid 7/26/22 2pm Construction of a new middle school building, construction of a new sports field, renovation of a se... | 07/26/2022 | ||
| Camera Migration 6/30/22 2pm 1. The School District has 23 sites that need to have cameras removed and some reinstalled at other ... | 06/06/2022 | 06/30/2022 | |
| Sam Johnson Park ADA Improvements 7/5/22 2pm The City of Redmond Public Works Parks Division is requesting bids from qualified and experienced ve... | 06/07/2022 | 07/05/2022 | |
| Maxwell & N Delta Ped Improve 7/12/22 10am 1. Implement temporary traffic control measures. 2. Implement temporary erosion and sediment control... | 07/12/2022 | ||
| Title | Site Walk Through | Deadline |