| District 11 Shoulder Aggregate 7/12/22 11am ODOT is seeking 1 qualified Contractor to provide approximately 4250 cubic yards of 3/4 to 0 shoulde... | 07/12/2022 | ||
| Culvert Repair Project 7/11/22 3pm Supply materials, equipment, labor and incidentals for the installation of a 48 inch CIPP/SAPL Liner... | 07/11/2022 | ||
| Archie Creek Fire Recovery Pavement Repairs 7/14/22 2pm Complete Cold Plane Pavement Removal of asphalt concrete surface, furnish and place Emulsified Aspha... | 07/14/2022 | ||
| Gateway & Kruse Way Safety Improve 7/20/22 2pm This project involves installing raised median islands, traffic separators along Gateway Street, and... | 07/06/2022 | 07/20/2022 | |
| McDonald Park Splash Pad Project ****Project Withdrawn*** Replace the wading pool at McDonald Park with a new splash pad, in addition to replacing the shade s... | 06/13/2022 | 07/21/2022 | |
| Thomas Rd. Storm Damage Repair 7/19/22 2pm The work to be done consists of traffic control systems, removing existing culvert, installing new c... | 07/19/2022 | ||
| CM/GC Roseburg Navigation Center Remodel 7/21/22 2pm The project generally consists of the interior remodel of an existing 22,170 SF building located at ... | 07/12/2022 | 07/21/2022 | |
| Dyerville Loop Rd. & Ft. Seward Rd. 7/19/22 2pm The work to be done consists of traffic control systems, removing existing culverts, installing new ... | 07/19/2022 | ||
| Wilder Ridge Rd. Storm Damage Repair 7/19/22 2pm The work to be done consists of paving, roadway excavation, removing the decommissioned roadways, an... | 07/19/2022 | ||
| Construct Pump Station Decom Project 7/26/22 2pm Consists of gravity sewer improvements on Ferguson Road between King Solomon Lane & Ferguson Cou... | 07/13/2022 | 07/26/2022 | |