| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Ramsey Grandview Ped Safety 6/30/22 3pm This Project will Consist of Installing Approximately 69 LF of 12” Stormdrain Pipe, 5 Concrete Inlet... | 06/23/2022 | 06/30/2022 | |
| Clear Creek WWTP Pyrolysis Phase 1 7/19/22 3pm • Installation of biodryers and pyrolysis units for biosolids treatment for solids reduction; • Inst... | 06/28/2022 | 07/19/2022 | |
| Media Ctr. Drain Repair/Retaining Wall 7/7/22 2pm Install foundation drains, replace steps, add new retaining walls and curbs, sidewalks and irrigati... | 06/22/2022 | 07/07/2022 | |
| Outdoor Eating Spaces Phase 2 7/7/22 2pm Supply and install Five (5) Outdoor Eating Spaces approximately 40’ x 60’ each, per MSD specificatio... | 06/22/2022 | 07/07/2022 | |
| 2022 Cape Seal Project 7/1/22 2pm The work consists of placing an asphalt rubber binder chip seal, microsurfacing, and pavement deline... | 07/01/2022 | ||
| OIT South Landscape Project 6/30/22 1pm Landscape of two areas directly south of the new CEET Building. This project includes the installati... | 06/16/2022 | 06/30/2022 | |
| Salmon Harbor Marina Dredging 6/30/22 2pm Dredging approximately (up to) 20,000 cubic yards of river sediment from two locations in Winchester... | 06/30/2022 | ||
| Yreka Fuels Reduction Project 7/15/22 5pm Hazardous fuels reduction activities required for the treatment of 50 acres and defensible space tre... | 06/23/2022 | 07/15/2022 | |
| Crescent Elk MS Emergency Generator 6/28/22 2pm Provide & install emergency generator per specifications. | 06/15/2022 | 06/28/2022 | |
| Deschutes Co. Fair & Expo HVAC & Controls 7/22/22 2pm Implement Energy Trust energy saving protocols to modernize Deschutes County Expo Center buildings: ... | 06/23/2022 | 07/22/2022 | |
| Title | Site Walk Through | Deadline |