| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Newell Sewer Collection & Lagoon 8/18/22 2pm Furnish and install approximately 3,600 linear feet of sanitary sewer and appurtenances, demolition ... | 08/18/2022 | ||
| Road Maintenance Bald Hills Rd. 8/2/22 2pm The work to be done consists of traffic control systems, applying a double chip seal, and culvert re... | 08/02/2022 | ||
| Sacred Heart Faith Formations 8/4/22 2pm The proposed project is a new single-story 12,197 square foot religious-use building for Sacred Hear... | 07/08/2022 | 08/04/2022 | |
| Enterprise Well #10 Motor Replace 7/28/22 3pm Remove and replace submersible 150 HP, 4 pole well motor. | 07/28/2022 | ||
| Washington Jefferson Park Soil Restore 8/9/22 2:30pm Restoration of the irrigation system, topsoil, turf, and electrical to its original condition, prior... | 07/27/2022 | 08/09/2022 | |
| Central Avenue Road Repairs 8/3/22 11am Manhole Rehabilitation, ADA Curb Ramps, Erosion Control/Slope, Bank Stabilization, Sidewalks/Curbs/G... | 07/20/2022 | 08/03/2022 | |
| Cal Wastewater Pump Station 7/21/22 2pm Perform design services for the rehabilitation of the existing California Lift Station located at 39... | 07/21/2022 | ||
| Pacific Terrace Pipe Lining 7/28/22 2pm Work shall include, but not necessarily be limited to: Lining of 2,350 feet of sewer main and top ha... | 07/19/2022 | 07/28/2022 | |
| Oakland SCADA WWTP ***Cancelled*** The City of Oakland’s Wastewater Treatment Plant and lift station is responsible for treating, on av... | 07/25/2022 | 08/18/2022 | |
| CM/GC Riddle Fire Station Retrofit 7/29/22 4pm The seismic retrofit of Riddle Fire Station includes the rehabilitation to the existing lateral syst... | 07/15/2022 | 07/29/2022 | |
| Title | Site Walk Through | Deadline |