| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Glenwood Site Access Road 7/13/22 2pm Construction of an access road at EWEB’s Glenwood Site. | 06/30/2022 | 07/13/2022 | |
| Palo Cedro Water Backup Generator 7/14/22 11am Install a 125kW propane-fired generator to provide backup power for the well pump building and sewer... | 07/07/2022 | 07/14/2022 | |
| Harbeck & Grandview RRFB ADA Ramps 6/30/22 3pm Mobilization of equipment & materials, work zone traffic control, erosion & sediment control... | 06/30/2022 | ||
| Automated Package Locker System 7/12/22 5pm The University of Oregon (University), is soliciting Proposals for automated package locker system. | 07/12/2022 | ||
| Replace Roof Buildings 1 & 3 Crater Lake NP 7/28/22 3pm Replace Roof Buildings #1 and #3 (Sager & Canfield Buildings), Crater Lake National Park, Klamat... | 07/07/2022 | 07/28/2022 | |
| FY 23 Overlay Maintenance 7/7/22 3pm Work includes cold plane removal, installation of approximately 4500 tons of asphalt paving and misc... | 06/30/2022 | 07/07/2022 | |
| OR140 & OR66 Intersection Improve 7/14/22 9am 1. Construct a new alignment for OR140. 2. Construct a new cul-de-sac at the end of Balsam Drive. 3.... | 07/14/2022 | ||
| City of Bend Signal Upgrades 7/14/22 9am 1. Install traffic signal modifications at eight different locations within the city of Bend. 2. Ins... | 07/14/2022 | ||
| Region 4 Arts Project 7/14/22 9am 1. Construct realigned northbound on-ramp from Powers Road to The Dalles-California Highway. 2. Cons... | 07/14/2022 | ||
| 3rd & Central Green Parking Lot 7/12/22 2pm The project consists of constructing a green parking lot including: permeable pavers, concrete sidew... | 06/28/2022 | 07/12/2022 | |
| Title | Site Walk Through | Deadline |