| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Passenger Walkway Canopy Eugene Airport 9/22/22 2:30pm Construction of a new approximately 505′ long canopy over an existing walkway at the Eugene Ai... | 09/01/2022 | 09/22/2022 | |
| McKenzie River Intake Design Services 9/9/22 4pm This project consists of designing a new intake and raw water pump station, which utilizes the McKen... | 09/01/2022 | 09/09/2022 | |
| Cherry Street Meats 9/13/22 2pm Requesting bid proposals from suppliers and subcontractors for all trades but not limited to: Stakin... | 09/13/2022 | ||
| Arch Svcs. Fire Station Modernization 9/22/22 3pm The effort associated with this project will require two separate phases. Phase 1 will involve preli... | 09/22/2022 | ||
| STP1 & STP2 Outfall Inspections 9/9/22 4pm Inspection of two wastewater outfalls. Consultants must be on a bidders list prior to September 1, 2... | 09/09/2022 | ||
| Lower Deadfall Meadows Eddy Crk Trail Restore 9/12/22 3pm Lower Deadfall Meadows Trail – improve non-motorized trail access in conjunction with mitigating res... | 08/25/2022 | 09/12/2022 | |
| Maxwell Rd. ADA Improvements 9/13/22 10am Cold plane pavement removal 2 inch deep, 1,200 square yards; level 3, ½ inch, ACP Mixture, 350 tons;... | 09/13/2022 | ||
| Recreation Facility Archie Creek 9/8/22 10am Emerald Waters Pavilion: Remove and replace roof decking, roofing, fascia, existing lumber around st... | 09/08/2022 | ||
| Group 6A Piping Project 9/13/22 2pm • Furnishing, welding, installation and testing of approximately 12,510 LF of 48” Solid-Wall Pipe, w... | 08/31/2022 | 09/13/2022 | |
| I-5 MP25-24 SB Field Fence & Gates 9/7/22 2pm Remove the existing fence and install Type 2 Field Fence, with emergency gate access, located in Jac... | 08/25/2022 | 09/07/2022 | |
| Title | Site Walk Through | Deadline |