| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| US101 Munsel to OR126 10/22/20 9am Grading, paving, signing & curb ramps | 10/22/2020 | ||
| US97 Nels Anderson Romaine Village 10/22/20 9am Grading, drainage, structures, paving, curb ramps, signing & signals | 10/22/2020 | ||
| Metal Roof Installation 10/7/20 4pm Installation of insulation and metal roof with a 4/12 pitch on a 40x60x24 metal building. All mater... | 10/07/2020 | ||
| Leachate Pond & Floating Cover Replace 12/16/20 10am Remove and dispose of existing floating cover system into onsite landfill; remove estimated 500,000 ... | 12/16/2020 | ||
| South Hills 4th Level Reservoir 11/12/20 2pm Construction of a new South Hills 4th Level Reservoir, a 0.46-million-gallon (MG) ground level welde... | 10/07/2020 | 11/12/2020 | |
| ZIRC Annex Abatement & Demolition 10/13/20 2pm Asbestos Abatement and demolition of a 20′ x 50′ metal building located on the North Sid... | 10/13/2020 | ||
| 36th Avenue Water Main Replacement 10/20/20 2pm Water main replacement on 36th Ave Crest Dr to Monroe St. in Eugene OR. | 10/20/2020 | ||
| Weekend Beer Company 10/13/20 2pm New construction of pre-engineered metal building with design/build MEP systems. Work also includes ... | 10/13/2020 | ||
| Huestis Hall Deferred Maintenance 10/16/20 2pm Preconstruction and Construction services for the Huestis Hall Deferred Maintenance Project encompas... | 10/06/2020 | 10/16/2020 | |
| Pruner Industrial Way Traffic Control Project 10/30/20 2pm The project scope includes two phases. Phase 1 consists of engineering design of the chosen traffic... | 10/30/2020 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.