| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Springhill Suites Marriott 10/28/20 2pm Ground up wood framed 4 story hotel that is 79,712 SF in Navigators Landing. 149 room hotel on 2.52 ... | 10/28/2020 | ||
| GP Waterline Crossing I-5 10/22/20 3pm Installation of approximately 3,140 Lineal Feet of 12″ Ductile Iron Water Main Pipe of which 1... | 10/15/2020 | 10/22/2020 | |
| Reinhart Park Pergola Repairs 10/29/20 3pm REPLACEMENT OF ALL PERGOLA WOOD COMPONENTS WITH DECAY RESISTANT WOOD AND PRIME/PAINT NEW WOOD TO MAT... | 10/15/2020 | 10/22/2020 | |
| Jewett Elementary New Building 10/22/20 2pm Construction of a new 11,442 sf gymnasium and makerspace building. Main structure consists of two pr... | 10/22/2020 | ||
| Remove & Replace Asphalt WWTP 10/19/20 12pm Grind and remove existing asphalt, place new asphalt, and raise valve boxes and lids to grade at the... | 10/19/2020 | ||
| Corvallis HS Supply Metal Building Systems 10/15/20 2pm Supply of the Metal Building Systems | 10/15/2020 | ||
| Solid Waste Welding Building Drainage 10/15/20 3pm Replace asphalt concrete around the southwest corner of the Welding Building with concrete and aspha... | 10/15/2020 | ||
| Annual Campus Roof Repair & Replace 10/27/20 2pm Oregon State University (“OSU” and/or “Owner”) is conducting a competitive ONE OR TWOSTEP Comprehens... | 10/12/2020 | 10/27/2020 | |
| Asphalt Pavement Repairs 10/20/20 2pm Asphalt Pavement Repairs on eight street sections with approximately 7,000 Square Yards of Asphalt P... | 10/20/2020 | ||
| Cleveland & Emerald Watermain Replace 10/29/20 2pm Construction of 8 inch potable waterline, construction of potable water services and fire hydrant co... | 10/13/2020 | 10/29/2020 | |
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.